Center for American Progress

Everything You Think You Know About Coal in China Is Wrong
Report

Everything You Think You Know About Coal in China Is Wrong

China’s new coal-fired power plants are cleaner than ours—and stronger on climate change.

In this article
A worker watches as a conveyor loads coal onto a trailer truck at a coal mine near Ordos in northern China's Inner Mongolia Autonomous Region, November 2015. (AP/Mark Schiefelbein)
A worker watches as a conveyor loads coal onto a trailer truck at a coal mine near Ordos in northern China's Inner Mongolia Autonomous Region, November 2015. (AP/Mark Schiefelbein)

See also: “Research Note on U.S. and Chinese Coal-Fired Power Data” by Melanie Hart, Luke Bassett, and Blaine Johnson

China’s energy markets send mixed signals about the nation’s policy intentions and emissions trajectory. Renewable energy analysts tend to focus on China’s massive renewable expansion and view the nation as a global clean energy leader; coal proponents and climate skeptics are more likely to focus on the number of coal plants in China—both in operation and under construction—and claim its climate rhetoric is more flash than substance.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

In December 2016, the Center for American Progress brought a group of energy experts to China to find out what is really happening. We visited multiple coal facilities—including a coal-to-liquids plant—and went nearly 200 meters down one of China’s largest coal mines to interview engineers, plant managers, and local government officials working at the front lines of coal in China.

We found that the nation’s coal sector is undergoing a massive transformation that extends from the mines to the power plants, from Ordos to Shanghai. China is indeed going green. The nation is on track to overdeliver on the emissions reduction commitments it put forward under the Paris climate agreement, and making coal cleaner is an integral part of the process.

From a climate perspective, the ideal scenario would be for China to shut down all of its coal-fired power plants and switch over to clean energy full stop. In reality, China’s energy economy is a massive ship that cannot turn on a dime. The shift toward renewables is happening: China’s Paris commitment includes a promise to install 800 gigawatts to 1,000 gigawatts of new renewable capacity by 2030, an amount equivalent to the capacity of the entire U.S. electricity system.1 While China and the United States have roughly the same land mass, however, China has 1.3 billion people to the United States’ 325 million.2 It needs an electricity system that is much larger, so adding the renewable equivalent of one entire U.S. electricity system is not enough to replace coal in the near to medium term. To bridge the gap, China is rolling out new technologies to drastically reduce local air pollution and climate emissions from the nation’s remaining coal plants.

This issue brief covers three things American observers need to understand about coal in China:

  1. China’s new coal-fired power plants are cleaner than anything operating in the United States.
  2. China’s emissions standards for conventional air pollutants from coal-fired power plants are stricter than the comparable U.S. standards.
  3. Demand for coal-fired power is falling so quickly in China that the nation cannot support its existing fleet. Many of the coal-fired power plants that skeptics point to as evidence against a Chinese energy transformation are actually white elephants that Chinese leaders are already targeting in a wave of forced plant closures.

Energy solutions that work well for China will not necessarily work well for the United States. In addition to the massive population disparity, the United States has access to cheap and plentiful shale gas, and China does not. If China is going to reduce emissions substantially, more efficient coal generation has to be part of its equation, at least for the near to medium term. In the United States, investing in next-generation clean coal plants is not a good solution because natural gas is cheap, plentiful, and lower-emitting than all but the most expensive coal-fired power.

Regardless of what works best in the U.S. market, understanding how Beijing is transforming its coal sectors is critical for understanding what to expect from the Chinese energy market going forward and how we should view China’s position in the global effort to combat climate change.

China is greening its coal fleet

Beijing is stuck between a rock and a hard place. On the one hand, China cannot eradicate coal-fired power from its energy mix overnight. China has not yet figured out how to develop its own natural gas supplies—which are more difficult to access and therefore more expensive than those in the United States—and renewable energy expansion takes time. On the other hand, Chinese citizens are demanding cleaner air, and they want immediate improvements. Air quality is now a political priority for the Chinese Communist Party on par with economic growth and corruption. This means that China cannot continue to run the same high-pollution coal plants that were considered acceptable decades ago. Beijing’s solution is to move full speed ahead with renewables while simultaneously investing in what may become the most efficient, least polluting coal fleet the world has ever seen.

Not all coal-fired power is created equal. Emissions and efficiency—the latter being the amount of coal consumed per unit of power produced, which also affects emissions—vary dramatically based on the type of coal and coal-burning technology used. What many U.S. analyses of China’s coal sector overlook is the fact that Beijing has been steadily shutting down the nation’s older, low-efficiency, and high-emissions plants to replace them with new, lower-emitting coal plants that are more efficient that anything operating in the United States.

To better understand where China’s coal fleet is going, CAP compared the top 100 most efficient coal-fired power units in the United States with the top 100 in China. (see Tables A1 and A2) The difference is astounding.

Compared with the Chinese coal fleet, even the best U.S. plants are running older, less efficient technologies. Coal-fired power plants can generally be broken down into three categories:

  1. Subcritical: In these conventional power plants, coal is ignited to boil water, the water creates steam, and the steam rotates a turbine to generate electricity.3 The term “subcritical” indicates that internal steam pressure and temperature do not exceed the critical point of water—705 degrees Fahrenheit and 3,208 pounds per square inch.4
  2. Supercritical: These plants use high-tech materials to achieve internal steam temperatures in the 1,000–1,050 degrees Fahrenheit range and internal pressure levels that are higher than the critical point of water, thus spinning the turbines much faster and generating more electricity with less coal.5
  3. Ultra-supercritical: These plants use additional technology innovations to bring temperatures to more than 1,400 degrees Fahrenheit and pressure levels to more than 5,000 pounds per square inch, thus further improving efficiency.6

The U.S. coal fleet is much older than China’s: The average age of operating U.S. coal plants is 39 years, with 88 percent built between 1950 and 1990.7 Among the top 100 most efficient plants in the United States, the initial operating years range from 1967 to 2012. In China, the oldest plant on the top 100 list was commissioned in 2006, and the youngest was commissioned in 2015.

The United States only has one ultra-supercritical power plant.8 Everything else is subcritical or, at best, supercritical. In contrast, China is retiring its older plants and replacing them with ultra-supercritical facilities that produce more energy with less coal and generate less emissions as well. Out of China’s top 100 units, 90 are ultra-supercritical plants.

When the capacity of each of the top 100 units in each nation is taken into account, ultra-supercritical technology accounts for 92 percent of Chinese top 100 capacity and less than one percent—0.76 percent—of U.S. top 100 capacity. Because the technological makeup of the Chinese plants is different, their emissions levels are different as well. In the United States, the total nameplate capacity of our top 100 most efficient coal-fired power units is 80.1 gigawatts, and their cumulative annual carbon emissions amount to 361,924,475 metric tons.9 Meanwhile, the total nameplate capacity of China’s top 100 units is 82.6 gigawatts, and their cumulative annual carbon emissions are an estimated 342,586,908 metric tons.10 Since China’s fleet uses more advanced technology, it also consumes less coal: an average of 286.42 grams of coal equivalent, or gce, consumed per kilowatt-hour of power produced in China versus 374.96 gce consumed per kilowatt-hour produced at lower heating value in the United States.

To be sure, China still has plenty of older coal-fired power units that are not using the most advanced technology. According to the latest third-party research from S&P Global Platts, which provides research on global energy infrastructure, when the data set is expanded to include all operating coal-fired power capacity in China—which totals 920 gigawatts—approximately 19 percent uses ultra-supercritical technology, 25 percent uses supercritical technology, and 56 percent uses subcritical technology.11 However, the new builds are increasingly ultra-supercritical plants, and Beijing is steadily ratcheting up the emissions requirements and efficiency standards for those older plants as well.

By 2020, every existing coal-fired power unit in China must meet an efficiency standard of 310 gce per kilowatt-hour; any units that do not meet that standard by 2020 will be retired. In contrast, none of the current top 100 most efficient U.S. coal-fired power units would meet that same efficiency standard today. (see Table A2)

The simple fact is that the United States has a wide array of cheap and abundant energy options that now compete with coal-fired electricity generation—particularly shale gas and renewables. Given the additional context of falling U.S. electricity demand and improving efficiency, even U.S. electric utility executives have indicated that their business models are rebalancing toward these options—and away from coal.12 Although higher-tech plants, such as ultra-supercritical plants, have lower operation and maintenance costs than their less efficient counterparts, overnight capital costs are, on average, around 17 percent higher.13 In a market where even the least expensive coal-fired plants are struggling to compete with shale-gas-fired plants, those investments do not make good financial sense.

One thing China’s experience makes very clear is that even if the United States were to invest in newer, more efficient coal plants, it would not be a major jobs generator on par with renewable energy. As China’s power plants are becoming more efficient in their energy consumption and emissions, they are also becoming more efficient in terms of labor. The CAP research team visited the Shanghai Waigaoqiao No. 3 power station. That plant runs two 1,000 megawatt ultra-supercritical units and supports 250 employees.14 In contrast, the nearby Waigaoqiao No. 1 and Shidongkou No. 1 power stations each run four 300 megawatt subcritical units and employ 600 people and 1,000 people, respectively.15

The same thing is happening in China’s coal mines. As the operations become higher tech, they become cleaner and more efficient, and those jobs decrease as well. This is one reason Beijing expects its coal sector to lay off 1.3 million workers from 2016 to 2020.16 Chinese leaders view renewable energy as a much more dependable employment generator; they expect the nation’s renewable sectors to generate 13 million new jobs by 2020.17

China’s energy employment shifts follow a pattern that has been unfolding in the United States for decades. U.S. coal mining employment peaked in the 1920s and then began a long and steady decline. From 1983 to 2014, U.S. coal production increased more than 28 percent, but employment still fell 59 percent.18 This reflects a shift in U.S. coal production from more labor-intensive underground mining in the eastern United States to more highly mechanized and easily accessible surface mining in the west.19 Falling U.S. electricity demand, rising energy efficiency, and sharp price drops for natural gas, solar, and wind compounded U.S. energy employment shifts by reducing utilities’ dependence on and demand for coal.20 At year-end 2016, the United States had a total of 54,030 coal operator employees nationwide.21 In contrast, between 2015 and 2016, the United States added 73,615 new jobs in solar energy generation—a nearly 25 percent year-on-year increase—bringing the total number of U.S. solar energy generation jobs to 373,807 nationwide.22

China’s emissions standards are stronger than ours

One of the levers that Beijing is pulling to move China’s coal-fired power fleet toward the cleanest, most efficient technologies on the market is steadily tightening pollution emissions standards.

China hit an inflection point on air pollution in late 2011. That fall, a series of pollution crises highlighted the fact that Beijing’s public air quality reporting system—which measured air quality based on the number of “blue sky days”23 achieved per year, some of which looked decidedly gray to citizen observers—did not provide Chinese citizens with accurate information about local air quality.24 Chinese citizens demanded more accurate information—particularly on small-particulate pollution, or PM 2.5, which the Chinese government was refusing to share—and refused to back down.25 Facing a rising political crisis, Chinese leaders shifted their strategy.26 Instead of continuing to hide air quality information from its citizens to give polluters more leeway to pursue breakneck growth, Beijing flipped the script by going public with the nation’s pollution data and using citizen anger as a lever to force polluters to comply with the nation’s environmental regulations.27 As part of that broader strategy, Beijing rolled out a new air quality monitoring system that now provides real-time information on air quality across the nation.28

Prior to this shift, Chinese citizens knew the air was bad but did not have the scientific information they needed to tie air quality to specific health effects. Today, Chinese citizens assess local PM 2.5 levels throughout the day and know what those particulates are doing to their children.29 For the Chinese Communist Party, there is no going back—this is now a political survival issue, and recent regulatory trends reflect that.

Starting in 2014,30 China rolled out new air pollution emissions standards for new and existing coal-fired power plants that are stronger than the comparable standards from the European Union and the United States. When visiting coal facilities in China, CAP found that some coal-fired power facilities display real-time emissions levels for these key local air pollutants on large billboards outside the main gate, particularly the cleaner plants that want to advertise their technical superiority.

Currently, Beijing is primarily concerned with tightening emissions standards for conventional air pollution, since that is the primary concern of the Chinese public. The next round of regulatory tightening will target carbon dioxide.

Beijing is already moving to address carbon pollution by rolling out strict new standards for plant efficiency. These standards force Chinese plants to reduce the amount of coal consumed—and thus the amount of carbon emitted—per unit of power produced. By 2020, all coal-fired units nationwide must achieve the following efficiency standards or shut down: 300 gce per kilowatt-hour for all new plants and 310 gce per kilowatt-hour for all existing plants.31 No plant on the U.S. top 100 list can currently meet these efficiency standards. The United States currently does not have any enforceable federal emissions standards for carbon pollution from power plants, and the Trump administration is in the process of reviewing—and potentially weakening or nullifying—the Obama-era carbon emissions standards for new and existing power plants.32

If current U.S. regulatory trends continue, by 2020, every coal plant operating in the United States would be illegal to operate in China.

China’s recent construction boom was a provincial pipe dream

One thing that continually confuses American observers is the fact that although China’s coal consumption peaked in 2013, the following years brought a boom in plant construction. China added approximately 51,294 megawatts of new capacity in 2015—of which 11 percent was subcritical, 30 percent was supercritical, and 48 percent was ultra-supercritical—and 35,509 megawatts of new capacity in 2016—of which 11 percent was subcritical, 38 percent was supercritical, and 51 percent was ultra-supercritical.33

What American observers need to know is that many of those new plants are white elephants that China cannot fully utilize. They represent a blip rather than a trend, and Beijing is already moving to shut down many of these new plants.

In 2014, energy policy collided with a parallel Chinese bureaucratic initiative to reduce red tape. Prior to 2014, constructing a new coal plant required central government approval; in October 2014, Beijing devolved that approval authority down to the provinces.34 Since local government officials understand their regional demand circumstances better than central planners, Beijing assumed that local officials could make faster and better project approval decisions, thus improving administrative efficiency. The problem was that Beijing underestimated the other interests affecting those decisions at the local level.

Out in the provinces, Chinese investors knew a crackdown on coal-fired power was already underway and wanted to build their own plants before the window of opportunity closed. They also knew Beijing had not yet dismantled the top-down purchase quotas and state-controlled pricing system for coal-fired power. Those systems are holdovers from the planned economy: The nation’s two state-owned grid companies sign annual contracts to purchase electricity at state-fixed rates from all operating coal-fired power plants; even if electricity demand falls, the price of coal falls, or grid companies could purchase electricity more cheaply from other sources, those grid companies cannot abandon these coal power purchasing contracts.35 China’s economic planners do adjust the state-fixed rates to reflect market conditions, but adjustments happen only a few times per year and tend to be much smaller than the commodity market shifts that affect generation costs.36 This system is much more rigid than the U.S. system in which spot markets allow grid companies to purchase electricity from a variety of sources based on the lowest bid price at intervals of every few minutes.37 China’s system is much less efficient, but from an investor standpoint, it provides a guaranteed rate of return. In 2014 and 2015, those returns looked particularly rosy because coal prices were hitting record lows.38 Power plants could buy coal on the open market at rock-bottom prices and sell the power to China’s utilities at state-controlled rates. Despite the fact that the nation’s coal fleet was already underutilized and demand was steadily falling, investors still knew they could make a profit in the short term, so they flooded provincial officials with applications to construct new coal-fired power plants.39

Local officials—who suddenly found themselves empowered to approve those applications—knew demand was falling but wanted the tax revenue and jobs these projects would bring. Local officials also knew Beijing was steadily shutting down the nation’s outdated, pollution-intensive coal plants—including many in their own provinces—and wanted to quickly bring cleaner plants on line to keep coal jobs and coal tax revenue in their district. Provinces that cannot supply their own power must import power from their neighbors, and officials would generally prefer to be on the exporting side of that exchange, since the exporter has more revenue-seeking opportunities.40

Beijing ordered local officials to assess new project applications based on local demand conditions and central government energy policy priorities, which included a shift away from coal-fired power.41 Instead, local officials all raced to be the last coal-fired province standing.

The result was a glut of coal plants that the nation could not actually use.42 Grid operators responded by spreading purchase quotas thinner and thinner among the nation’s expanding fleet of coal-fired power plants. Currently, Beijing is forcing every plant in the nation to run at the same utilization rate, which is approximately 47.7 percent of total plant capacity.43 In 2016, plant utilization fell to levels that China had not seen since the 1970s, when the nation was just emerging from the cultural revolution.

As soon as Chinese leaders saw what was happening they issued a series of orders aimed at reigning in this behavior. (see text box: China regulatory timeline) They started out ordering local officials to do a better job matching project approvals to local demand and to Beijing’s energy policy dictates; when that failed to stem the tide, Beijing started intervening to cancel projects, including many projects that were already under construction. Earlier this year, China’s National Energy Administration canceled 103 coal-fired power projects across 13 provinces that, if completed, would have added 120,000 megawatts of coal-fired power to the grid.44 Beijing is also steadily shutting down older, existing plants that cannot meet the nation’s increasingly tight emissions regulations.

In Beijing, Chinese leaders have a clear policy vision. They want to grab the clean energy bull by the horns and leverage those technologies to create new jobs at home and new export opportunities abroad.45 When local officials went on a coal-fired power construction approval spree, Beijing recognized that local incentive structures did not match national priorities and cracked the whip. Now thermal capacity growth is dropping, and that drop is likely to accelerate going forward.

Conclusion

The United States has a broader array of energy options than China does. However, China is innovating and investing heavily in what it has, and some of the transformations it is achieving already are truly impressive.

China’s leaders have made a strategic choice about the direction of the country: They are aiming to shift from an economy based on heavy, polluting industries to one driven by technology and innovation. The political will for this upgrade has roots in both international geostrategic ambitions and domestic popular grievances about lagging standards of living—and it is beginning to bear fruit. In the process, however, vested interests and technical stumbling blocks have wasted resources and acted as a ballast against Chinese progress. China has the potential to do much more, and the international community should push it to achieve that potential.

For the United States, the signal should be clear: We cannot compete with China on coal-fired power, nor should we aspire to do so. Mimicking China’s development path with regards to intensive coal development would ignore economic reality and the United States’ competitive advantages in the electricity sector and beyond.

Authors’ note: The analysis conducted for this brief relied on extensive research of U.S. and Chinese coal data, and an accompanying research note describes those data sets, the authors’ methodologies, and key lessons learned.46

Melanie Hart is a Senior Fellow and Director of China Policy at the Center for American Progress. Luke H. Bassett is the Associate Director of Domestic Energy and Environment Policy at the Center. Blaine Johnson is a China and Asia Policy Analyst at the Center.

Appendix

China regulatory timeline: Beijing aims to rein in the nation’s coal-fired power bubble

October 2014

“Government Approvals for Investment Projects Catalogue 2014 Version” (State Council):47 Gives provincial-level officials the authority to issue construction permits for new coal-fired power plants. Previously, only central government officials could issue those permits. This 2014 notice delegated permitting authority down to the provinces but also instructed provincial officials to strictly follow central government coal control plans.

November 2015

“Notice on the Appropriate Use of Project Approvals for Electric Power Plants Under Decentralized Authority” (National Development and Reform Commission and National Energy Administration):48 Orders provincial authorities to stay within the boundaries of China’s national coal control objectives. States that provincial authorities must base new coal plant approval decisions on local demand conditions and complete the closing down and elimination of outdated coal-fired power plants before approving new ones. This notice also warns local officials that the National Energy Administration will monitor regional coal-fired power capacity and force officials in overcapacity regions to make cuts.

March 2016

“Notice on Promoting the Orderly Development of Coal Power” (National Development and Reform Commission and National Energy Administration):49 Calls for a phaseout of older coal-fired power units that fail to meet efficiency, environment, or safety standards. Orders local officials to shut down and eliminate smaller coal-fired power units—300 megawatts and below—and those that have been in operation for 20 years or more. Orders 13 provinces and regions with excess coal-fired power capacity—Anhui, Fujian, Gansu, Guangdong, Heilongjiang, Henan, Hubei, Inner Mongolia, Jiangsu, Ningxia, Shandong, Shanxi, and Yunnan—to halt all new project approvals until 2017. Orders 15 provinces—Gansu, Guangdong, Guangxi, Guizhou, Heilongjiang, Henan, Hubei, Inner Mongolia, Jiangsu, Liaoning, Ningxia, Shaanxi, Shandong, Shanxi, and Yunnan—to delay the construction of approved projects until after 2017.

March 2016

“Notice on Establishing a Coal Power Planning and Construction Risk Early Warning Mechanism” (National Energy Administration):50 Establishes a “traffic light” system to curtail the construction of new coal-fired power plants. Gives provinces a red light, orange light, or green light designation based on three factors: resource constraints; coal plant profitability; and existing coal-fired power capacity. Provinces with a red score in any of the three categories must immediately stop approving new projects; provinces with an orange score must proceed with caution. If a province suffers from severe air pollution, insufficient water resources, excess coal-fired power consumption, or excess production capacity, the province automatically receives a red light. This notice designated 26 provinces and municipalities as red light areas required to immediately halt all new coal plant construction projects.

April 2016

“Notice on Moving Forward to Phase Out Outdated Production Capacity in the Coal Power Industry” (National Development and Reform Commission and National Energy Administration):51 Defines standards and procedure for phasing out 20 gigawatts of outdated coal-fired power as required under the 13th five-year development plan for 2016 to 2020. Coal-fired power units targeted for retirement include smaller units without combined heat and power, units that fail to meet 2013 coal consumption efficiency standards, and units that fail to meet emissions standards. This notice orders utility companies to disconnect retired units from the electric grid and states that electricity generation companies that fail to comply with unit retirement orders will be punished. The notice also holds generation companies responsible for “properly handling the aftermath” with laid-off workers—for example, by assisting with worker retraining and transfers to other employment opportunities—to avoid triggering social unrest.

September 2016

“Notice Canceling Multiple Coal Power Projects Lacking Approved Construction Conditions” (National Energy Administration):52 Orders provincial authorities to cancel specific coal-fired power projects as part of implementing the March 2016 “Notice on Promoting the Orderly Development of Coal Power.” Targets 15 coal-fired power construction projects for cancelation—totaling 12.4 gigawatts—across 9 provinces. If the targeted projects have already commenced construction, then those activities must be halted regardless of the ramifications for investors. Warns provincial officials that the National Energy Administration will be on the lookout for “fake cancel, actually build” schemes and that any companies caught violating coal cancellation orders will be placed on a nationwide blacklist. The notice orders financial institutions, grid companies, licensing entities, and other relevant government agencies to refrain from issuing loans, business licenses, coal-fired power construction permits, and electric grid connection permits to companies violating this notice.

November 2016

“13th Five-Year Development Plan for the Electricity Sector (2016-2020):”53 Issues multiple five-year coal control targets including: reducing coal dependence from 59 percent of electricity production at year-end 2015 to no more than 55 percent by 2020; capping national coal-fired power capacity at 1,100 gigawatts; reducing sulfur oxide and nitrogen oxide emissions from coal-fired power plants more than 300 megawatts in size by at least 50 percent by 2020; and reducing carbon dioxide emissions to no more than 865 grams per kilowatt-hour. Also requires coal-fired power plants to achieve average coal consumption rates of no more than 300 grams of coal equivalent per kilowatt-hour for new plants and no more than 310 gce per kilowatt-hour for existing plants. Coal-fired power plants that cannot meet the new efficiency and emissions standards are to be shut down and disconnected from the grid. New coal-fired power construction projects that push regional and national capacity beyond the 1,100 gigawatt cap are to be canceled, including projects that have already commenced construction.

January 2017

Letter Regarding Scale of Coal Production Being Put into Operation Across Multiple Provinces in 13th Five-Year Plan Period (National Energy Administration):54 Orders 13 provinces—Gansu, Guangdong, Guangxi, Henan, Inner Mongolia, Liaoning, Ningxia, Qinghai, Shaanxi, Shandong, Shanxi, Sichuan, and Xinjiang—to halt construction activity and planning work for more than 102 gigawatts of new coal-fired power projects previously approved by provincial authorities. Provincial authorities approved those projects despite falling market demand and central government orders to reduce the nation’s dependence on coal and other fossil fuels.

Endnotes

  1. U.S. Energy Information Administration, Electric Power Annual 2015 (U.S. Department of Energy, 2016), available at https://www.eia.gov/electricity/annual/pdf/epa.pdf; Obama White House Office of the Press Secretary, “FACT SHEET: The United States and China Issue Joint Presidential Statement on Climate Change with New Domestic Policy Commitments and a Common Vision for an Ambitious Global Climate Agreement in Paris,” Press release, September 25, 2015, available at https://obamawhitehouse.archives.gov/the-press-office/2015/09/25/fact-sheet-united-states-and-china-issue-joint-presidential-statement.
  2. Central Intelligence Agency, “The World Factbook: China,” available at https://www.cia.gov/library/publications/the-world-factbook/geos/ch.html (last accessed April 2017); U.S. Census Bureau, “Population,” available at https://www.census.gov/topics/population.html (last accessed April 2017).
  3. Duke Energy, “How electricity works: energy from coal,” available at https://www.duke-energy.com/energy-education/how-energy-works/electricity-from-coal (last accessed April 2017).
  4. National Energy Technology Laboratory, “High Performance Materials,” available at https://www.netl.doe.gov/research/coal/crosscutting/high-performance-materials/Ultrasupercritical (last accessed April 2017).
  5. Ibid.
  6. Ibid.
  7. U.S. Energy Information Administration, “Today in Energy: Most coal plants in the United States were built before 1990,” April 17, 2017, available at https://www.eia.gov/todayinenergy/detail.php?id=30812&src=email.
  8. Dr. Robert Peltier, PE, “AEP’s John W. Turk, Jr. Power Plant Earns POWER’s Highest Honor,” POWER, August 1, 2013, available at http://www.powermag.com/aeps-john-w-turk-jr-power-plant-earns-powers-highest-honor/.
  9. U.S. carbon dioxide emissions as reported by the U.S. Environmental Protection Agency’s Air Markets Program Data. U.S. Environmental Protection Agency, “Air Markets Program Data,” available at https://ampd.epa.gov/ampd/ (last accessed April 2017). The U.S. Energy Information Administration calculated an annual average capacity factor for coal generators of 54.6 percent in 2015. See U.S. Energy Information Administration, “Today in Energy: Average utilization for natural gas combined-cycle plants exceeded coal plants in 2015,” April 4, 2016, available at https://www.eia.gov/todayinenergy/detail.php?id=25652.
  10. Chinese emissions calculated with an assumed 59.3 percent capacity factor by CoalSwarm. See CoalSwarm, “Global Coal Plant Tracker” (2017), available at http://endcoal.org/tracker/. Total nameplate capacity from Zhong Guo Dian Li Qi Ye Lian He Hui (China Electricity Council), “2016 nian quan guo dian li gong ye tong ji kuai bao shu zhu yi lan biao” (“Overview Report of the 2016 National Electricity Industry Statistical Data Bulletin”), January 20, 2017, available in Chinese at http://www.cec.org.cn/guihuayutongji/tongjxinxi/niandushuju/2017-01-20/164007.html. C.
  11. Approximately 0.2 percent of the megawatts in the Platts database are reported with unknown technology. See S&P Global Platts, “World Electric Power Plants Database, March 2017” (2017), available at https://www.platts.com/products/world-electric-power-plants-database.
  12. Scarlet Fu and Oliver Renick, “AEP’s CEO Weighs in on Trump’s Energy Plan,” Bloomberg, March 28, 2017, available at https://www.bloomberg.com/news/videos/2017-03-28/aep-s-ceo-weighs-in-on-trump-s-energy-plan-video.
  13. U.S. Energy Information Administration, Capital Cost Estimates for Utility Scale Electricity Generating Plants (U.S. Department of Energy, 2016), available at https://www.eia.gov/analysis/studies/powerplants/capitalcost/pdf/capcost_assumption.pdf.
  14. Waigaoqiao No. 3 power station leadership team, interviews with authors, Shanghai, December 2016. For more about Waigaoqiao and its technology, see Thomas W. Overton, “Top Plants: Shanghai Waigaoqiao No. 3, Shanghai, China,” POWER, October 1, 2015, available at http://www.powermag.com/shanghai-waigaoqiao-no-3-shanghai-china/?pagenum=1.
  15. Waigaoqiao No. 3 power station leadership team, interviews with authors, Shanghai, December 2016. Personnel numbers for the Shidongkou power station are also available from Huaneng Power International, Inc., “Hua neng shang hai shi dong kou di yi dian chang” (“Huaneng Shanghai Shidongkou No. 1 Power Station”), available in Chinese at http://www.hpi.com.cn/Pages/Subsidiarydetail.aspx?SubID=7b11466b-c7a1-4754-89e2-ba4f980a8b5a (last accessed May 2017).
  16. Zhong Hua Ren Min Gong He Guo Ren Li Zi Yuan He She Hui Bao Zhang Bu (Ministry of Human Resources and Social Security of the People’s Republic of China), “Ren Li Zi Yuan She Hui Bao Zhang Bu Guojia Fa Zhan Gai Ge Wei deng qi bu men guan yu zai hua jie gang tie mei tan hang ye guo sheng chan neng shi xian tuo kun fa zhan guo cheng zhong zuo hao zhi gong an zhi gong zuo de yi jian” (“Ministry of Human Resources and Social Security, National Development and Reform Commission, and Seven Other Departments’ Opinion on Completing Worker Resettlement Work as Resolving Overcapacity in the Steel and Coal Industries Achieves Reshaped Development”), April 7, 2016, available in Chinese at http://www.mohrss.gov.cn/gkml/xxgk/201604/t20160413_238000.html; Zhong Guo Wang (China Internet Information Center), “Guo Xin Ban jiu jiu ye he she hui bao zhang you guan qing kuang ju xing fa bu hui” (“State Council Information Office holds press conference on matters concerning employment and social security”), Q&A with YIN Weimin, February 29, 2016, available in Chinese at http://www.china.com.cn/zhibo/2016-02/29/content_37880605.htm?show=t. For an explainer in English, see Winter Nie, “Here’s Why China Laying Off 1.8 Million Workers Is Actually Good News,” Fortune, March 3, 2016, available at http://fortune.com/2016/03/03/china-mass-layoffs-steel-coal/.
  17. Guo Jia Neng Yuan Ju (National Energy Administration), “‘Shi san wu’ qi jian ke zai sheng neng yuan zong tou zi gui mo jiang da dao 2.5 wan yi yuan” (“Renewable Energy Total Investment Will Reach 2.5 Trillion Yuan during the 13th Five Year Plan Period”), January 5, 2017, available in Chinese at http://www.nea.gov.cn/2017-01/05/c_135956835.htm. For coverage in English, see Josephine Mason, “China to plow $361 billion into renewable fuel by 2020,” Reuters, January 5, 2017, available at http://www.reuters.com/article/us-china-energy-renewables-idUSKBN14P06P. For additional commentary, see Joe Romm, “Trump to cede millions of high-wage jobs to China,” ThinkProgress, January 5, 2017, available at https://thinkprogress.org/trump-to-abandon-millions-of-high-wage-jobs-to-china-3554a04796b1.
  18. Mine Safety and Health Administration, Coal Employment by State and County (CY 2009 – 2015) (U.S. Department of Labor), available at https://www.msha.gov/sites/default/files/Data_Reports/Charts/Coal_Employment_by_State_and_County_CY09to15.pdf (last accessed April 2017); personal communication from Mine Safety and Health Administration regarding its forthcoming Coal Employment and Production Report, CY 2012 to 2016, April 2017; U.S. Energy Information Administration, “Today in Energy: Quarterly coal production lowest since the early 1980s,” June 10, 2016, available at https://www.eia.gov/todayinenergy/detail.php?id=26612.
  19. U.S Department of Energy, Quadrennial Energy Review: Transforming the Nation’s Electricity System: The Second Installment of the QER (2017), available at https://energy.gov/sites/prod/files/2017/02/f34/Quadrennial%20Energy%20Review–Second%20Installment%20%28Full%20Report%29.pdf.
  20. Galen L. Barbose and Naïm R. Darghouth, “Tracking the Sun IX: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States” (Berkeley, CA: Electricity Markets & Policy Group, 2016), available at https://emp.lbl.gov/publications/tracking-sun-ix-installed-price; Mark Bolinger and Joachim Seel, “Utility-Scale Solar 2015: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States” (Berkeley, CA: Electricity Markets & Policy Group, 2016), available at https://emp.lbl.gov/publications/utility-scale-solar-2015-empirical; U.S. Energy Information Administration, “Today in Energy: U.S. electric generation capacity increase in 2016 was largest net change since 2011,” February 27, 2017, available at https://www.eia.gov/todayinenergy/detail.php?id=30112; U.S. Energy Information Administration, “Today in Energy: Natural gas prices in 2016 were the lowest in nearly 20 years,” January 13, 2017, available at https://www.eia.gov/todayinenergy/detail.php?id=29552.
  21. Personal communication from U.S. Department of Labor Mine Safety and Health Administration regarding the forthcoming “Coal Employment and Production Report, CY 2012 to 2016,” April 2017.
  22. U.S. Department of Energy, U.S. Energy and Employment Report (2017), available at https://energy.gov/sites/prod/files/2017/01/f34/2017%20US%20Energy%20and%20Jobs%20Report_0.pdf.
  23. China Daily, “Beijing no longer counting ‘blue sky days’,” June 6, 2012, available at http://usa.chinadaily.com.cn/china/2012-06/06/content_15476803.htm.
  24. Edward Wong, “Outrage grows over air pollution and China’s response,” The New York Times, December 6, 2011, available at http://www.nytimes.com/2011/12/07/world/asia/beijing-journal-anger-grows-over-air-pollution-in-china.html.
  25. PM 2.5 pollution readings measure particulate matter with a diameter of 2.5 micrometers and below. These small particles penetrate deeply into the lungs and generally cause more health damage than larger particles. In 2011, the Chinese government based the nation’s public air quality ratings only on the larger particles—PM 10—and suppressed information about the smaller, more dangerous particles. For more information on different types of particulate matter pollution, see U.S. Environmental Protection Agency, “Particulate Matter (PM) Basics,” available at https://www.epa.gov/pm-pollution/particulate-matter-pm-basics (last accessed May 2017).
  26. Daniela Yu and Anita Pugliese, “Majority of Chinese Prioritize Environment Over Economy,” Gallup, June 8, 2012, available at http://www.gallup.com/poll/155102/Majority-Chinese-Prioritize-Environment-Economy.aspx.
  27. China Daily, “Beijing no longer counting ‘blue sky days’,” June 6, 2012, available at http://usa.chinadaily.com.cn/china/2012-06/06/content_15476803.htm; Xinhua, “China declares war against pollution,” March 5, 2014, available at http://news.xinhuanet.com/english/special/2014-03/05/c_133162607.htm.
  28. Zheng Jinran, “Monitoring network to be further expanded,” China Daily, April 7, 2017, available at http://www.chinadaily.com.cn/china/2017-04/07/content_28827498.htm.
  29. Simon Denyer, “Stop making our children sick: Beijing parents force government action over smog,” The Washington Post, January 6, 2017, available at https://www.washingtonpost.com/news/worldviews/wp/2017/01/06/stop-making-our-children-sick-beijing-parents-force-government-action-over-smog/?utm_term=.4e13435b19ae.
  30. Guo Jia Fa Zhan Gai Ge Wei (National Development and Reform Commission), Huan Jing Bao Hu Bu (Ministry of Environmental Protection), and Guo Jia Neng Yuan Ju (National Energy Administration), “Mei dian jie neng jian pai sheng ji yu gai zao xing dong ji hua (2014-2020 nian)” (“Coal-fired energy-savings, emissions reduction, upgrade, and transformation action plan (2014-2020)”), September 12, 2014, available in Chinese at http://www.mep.gov.cn/gkml/hbb/gwy/201409/W020140925407622627853.pdf.
  31. Ibid.
  32. White House Office of the Press Secretary, “Presidential Executive Order on Promoting Energy Independence and Economic Growth,” Press release, March 28, 2017, available at https://www.whitehouse.gov/the-press-office/2017/03/28/presidential-executive-order-promoting-energy-independence-and-economi-1.
  33. S&P Global Platts was unable to determine technology type for 1 percent of the 2015 additions, so the known technology percentages add up to 99 percent instead of 100 percent. See S&P Global Platts, “World Electric Power Plants Database, March 2017” (2017), available at https://www.platts.com/products/world-electric-power-plants-database.
  34. Guo Wu Yuan (State Council), “Guo Wu Yuan guan yu fa bu zheng fu he zhun de tou zi xiang mu mu lu (2014 nian ban) de tong zhi; Zheng fu he zhun de tou zi xiang mu mu lu (2014 nian ben)” (“State Council Notice on the Issuance of the Government Approvals for Investment Projects Catalogue (2014 Version); Government Approvals for Investment Projects Catalogue (2014 Version)”), October 31, 2014, available in Chinese at http://www.gov.cn/zhengce/content/2014-11/18/content_9219.htm.
  35. Chinese energy experts and coal plant operators, interviews with authors, Beijing, Shanghai, and Ordos, December 2016.
  36. For example, see Reuters UK Credit RSS, “China to cut on-grid thermal power tariffs—state media,” March 27, 2015, available at http://uk.reuters.com/article/china-power-prices-idUKL3N0WQ34O20150327.
  37. Chinese energy experts and coal plant operators, interviews with authors, Beijing, Shanghai, and Ordos, December 2016. For an overview of the U.S. system, see U.S. Federal Energy Regulatory Commission, “Energy Primer: A Handbook of Energy Market Basics” (2015), available at https://www.ferc.gov/market-oversight/guide/energy-primer.pdf.
  38. Timothy Puko and Chuin-Wei Yap, “Falling Chinese Coal Consumption and Output Undermine Global Market,” The Wall Street Journal, February 26, 2015, available at https://www.wsj.com/articles/chinas-coal-consumption-and-output-fell-last-year-1424956878; China Daily, “China’s coal industry freezes over,” January 25, 2015, available at http://usa.chinadaily.com.cn/business/2015-01/25/content_19402093.htm.
  39. Chinese energy experts and coal plant operators, interviews with authors, Beijing, Shanghai, and Ordos, December 2016. See also Jiahai Yuan and others, “Coal power overcapacity and investment bubble in China during 2015–2020,” Energy Policy 97 (2016): 136–144.
  40. Chinese energy experts and coal plant operators, interviews with authors, Beijing, Shanghai, and Ordos, December 2016.
  41. Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Fa Zhan Gai Ge Wei Guo Jia Neng Yuan Ju guan yu zuo hao dian li xiang mu he zhun quan xian xia fang hou gui hua jian she you guan gong zuo de tong zhi” (“National Development and Reform Commission and National Energy Administration Notice on the Appropriate Use of Project Approvals for Electric Power Plants Under Decentralized Authority”), November 26, 2015, available in Chinese at http://www.nea.gov.cn/2015-11/26/c_134856367.htm.
  42. Yuan and others, “Coal power overcapacity and investment bubble in China during 2015–2020.”
  43. Chinese energy experts and coal plant operators, interviews with authors, Beijing, Shanghai, and Ordos, December 2016. See also Zhong Guo Dian Li Qi Ye Lian He Hui (China Electricity Council), “2016 nian quan guo dian li gong ye tong ji kuai bao shu zhu yi lan biao” (“Overview Report of the 2016 National Electricity Industry Statistical Data Bulletin”), January 20, 2017, available in Chinese at http://www.cec.org.cn/guihuayutongji/tongjxinxi/niandushuju/2017-01-20/164007.html.
  44. Beiji Xing Electricity Network News Center, “Neng Yuan Ju xia fa 13 sheng shi xin jian huo dian ji zu ting jian qing dan” (“National Energy Administration Letter Regarding Scale of Coal Production Being Put into Operation Across Multiple Provinces in 13th Five-Year Plan Period”), January 16, 2017, available in Chinese at http://news.bjx.com.cn/html/20170116/803648.shtml. For an article in English about the letter, see Zachary Davies Boren, “China suspends 104 planned coal power plants,” Greenpeace Energydesk, January 16, 2017, available at http://energydesk.greenpeace.org/2017/01/16/china-coal-power-overcapacity-crackdown/.
  45. Melanie Hart, “3 Things Americans Should Know About China in the Paris Climate Agreement,” Center for American Progress, February 9, 2017, available at https://americanprogress.org/issues/green/news/2017/02/09/414850/3-things-americans-should-know-about-china-in-the-paris-climate-agreement/.
  46. Melanie Hart, Luke Bassett, and Blaine Johnson, “Research Note on U.S. and Chinese Coal-Fired Power Data” (Washington: Center for American Progress, 2017), available at https://americanprogress.org/?p=432136.
  47. Guo Wu Yuan (State Council), “Zheng fu he zhun de tou zi xiang mu mu lu (2014 nian ben)” (“Government Approvals for Investment Projects Catalogue (2014 Version)”), November 18, 2014, available in Chinese at http://www.gov.cn/zhengce/content/2014-11/18/content_9219.htm.
  48. Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Fa Zhan Gai Ge Wei Guo Jia Neng Yuan Ju guan yu zuo hao dian li xiang mu he zhun quan xian xia fang hou gui hua jian she you guan gong zuo de tong zhi” (“National Development and Reform Commission and National Energy Administration Notice on the Appropriate Use of Project Approvals for Electric Power Plants Under Decentralized Authority”).
  49. Guo Jia Fa Zhan Gai Ge Wei (National Development and Reform Commission) and Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Fa Zhan Gai Ge Wei Guo Jia Neng Yuan Ju guan yu cu jin wo guo mei dian you xu fa zhan de tong zhi” (“National Development and Reform Commission and National Energy Administration Notice on Promoting the Orderly Development of Coal Power”), March 17, 2016, available in Chinese at http://www.sdpc.gov.cn/zcfb/zcfbtz/201604/t20160425_798979.html.
  50. Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Neng Yuan Ju guan yu jian li mei dian gui hua jian she feng xian yu jing ji zhi ji fa bu 2019 nian mei dian gui hua jian she feng xian yu jing de tong zhi” (“National Energy Administration Notice on Establishing a Coal Power Planning and Construction Risk Early Warning Mechanism”) (2016), available in Chinese at http://www.jsdpc.gov.cn/zixun/tzgg_1/201605/P020160506368498872942.pdf. For an explainer in English, see Feng Hao, “How China plans to curb new coal-fired power,” chinadialogue.net blog, June 22, 2016, available at https://www.chinadialogue.net/blog/9011-How-China-plans-to-curb-new-coal-fired-power-/en.
  51. Guo Jia Fa Zhan Gai Ge Wei (National Development and Reform Commission) and Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Fa Zhan Gai Ge Wei Guo Jia Neng Yuan Ju guan yu jin yi bu zuo hao mei dian hang ye tao tai luo hou chan neng gong zuo de tong zhi” (“National Development and Reform Commission and National Energy Administration Notice on Moving Forward to Phase Out Outdated Production Capacity in the Coal Power Industry”) (2016), available in Chinese at http://www.jsdpc.gov.cn/zixun/tzgg_1/201605/P020160518401068090038.pdf.
  52. Guo Jia Neng Yuan Ju (National Energy Administration), “Guo Jia Neng Yuan Ju guan yu zu xiao yi pi bu ju bei he zhun jian she tiao jian mei dian xiang mu di tong zhi” (“National Energy Administration Notice Canceling Multiple Coal Power Projects Lacking Approved Construction Conditions”), September 13, 2016, on file with authors. For English coverage of the notice, see Feng Hao, “2017 set to be a bleak year for coal,” chinadialogue.net blog, January 27, 2017, available at https://www.chinadialogue.net/blog/9587-2-17-set-to-be-a-bleak-year-for-coal-/en.
  53. Guo Jia Fa Zhan Gai Ge Wei (National Development and Reform Commission) and Guo Jia Neng Yuan Ju (National Energy Administration), “Dian li fa zhan “Shi san wu” gui hua (2016-2020 nian)” (“13th Five-Year Development Plan for the Electricity Sector (2016-2020)”) (2016), available in Chinese at http://www.sdpc.gov.cn/zcfb/zcfbghwb/201612/P020161222570036010274.pdf.
  54. Beiji Xing Electricity Network News Center, “Neng yuan ju xia fa 13 sheng shi xin jian huo dian ji zu ting jian qing dan” (“National Energy Administration Letter Regarding Scale of Coal Production Being Put into Operation Across Multiple Provinces in 13th Five-Year Plan Period”). For an article in English about the letter, see Boren, “China suspends 104 planned coal power plants.”

The positions of American Progress, and our policy experts, are independent, and the findings and conclusions presented are those of American Progress alone. A full list of supporters is available here. American Progress would like to acknowledge the many generous supporters who make our work possible.

Authors

© 2015 | Kristina Sherk Photography | www.Kristinasherk.com

Melanie Hart

Senior Fellow; Director, China Policy

Luke Bassett

Associate Director, Domestic Energy and Environment Policy

Blaine Johnson

Policy Analyst, China and Asia Policy

Just released!

Interactive: Mapping access to abortion by congressional district

Click here